Responsive image
博碩士論文 etd-0731120-095000 詳細資訊
Title page for etd-0731120-095000
論文名稱
Title
專案經理人的能力對專案績效的影響 -以專案複雜度為調節變數來探討
The Influence of Project Manager’s Competences on Project Performance – using Project Complexity as Moderator Variables.
系所名稱
Department
畢業學年期
Year, semester
語文別
Language
學位類別
Degree
頁數
Number of pages
68
研究生
Author
指導教授
Advisor
召集委員
Convenor
口試委員
Advisory Committee
口試日期
Date of Exam
2020-07-17
繳交日期
Date of Submission
2020-08-31
關鍵字
Keywords
複雜度、資訊科技、軟體開發、專案管理、專案經理
Project Management, Project Manager, Complexity, Information Technology, Information System Development
統計
Statistics
本論文已被瀏覽 5891 次,被下載 108
The thesis/dissertation has been browsed 5891 times, has been downloaded 108 times.
中文摘要
提升專案的成功率,一直以來就是業界尋求的目標,各種方法論百花爭鳴,從文獻回顧中得知,專案經理人的能力,左右了專案的成功機率,又專案經理的養成,非常的耗費成本,且時常耳聞工作能力不差的員工,升任專案經理之後,反倒是一場災難,到底什麼樣的能力與特質可以造就一位好的專案經理,進而領導專案團隊邁向成功的專案,提升企業的競爭力,是本研究想要探討的主要課題。
資訊開發專案除了具備有專案的獨特性、時效性之特質之外,更有組織與資訊科技(Information Technology)面向的複雜度,造就了資訊專案更是難為駕馭,其中關於動態的複雜度,因為多變性,所以更令專案經理難以掌握,因此本研究引入文獻中對於複雜度作為影響專案經理領導成功專案的因子,來探討在多變的環境下,專案經理的哪些的關鍵能力與特質,會影響專案的績效。因此,本研究以專案經理能力影響專案績效為基礎,來建構⼀個完整的研究模型來探討專案經理能力與專案績效的關聯性,並實際驗證之。
本研究透過紙本及網路的方式回收了272份有效樣本,用以驗證本研究模型,其結果支持相關推論,專案經理人的專案管理能力與團隊管理能力對於專案績效有正面的影響,且動態IT複雜度的調節亦對團隊管理能力具有調節效應。
Abstract
Improving the success rate of project has always been the goal of organizations and various methodologies contend. From the literature review, we know that the competence of the project manager has influenced the probability of success of the project. Since the development of project manager is very costly, and often heard that employees with poor working ability, after being promoted to project manager. The competencies can make a good project manager, and then lead the project team to a successful project, and enhance the competition of the enterprise is the main subject that this study wants to explore.
In addition to the uniqueness and timeliness of the project, the information system development project also has the complexity of organization and information technology which makes the information system development project even more difficult to control. Therefore, this study introduces the complexity in the literature as a moderator that affects the performance of the project manager on project to explore the key capabilities and characteristics of the project manager in a changing environment.
In this study, 272 samples were recovered through paper and online survey to verify the research model. The results support the hypothesis we have made. The project manager’s project management capabilities have a positive impact on project performance. The moderate effect of dynamic IT complexity is significant, but others constructor still can be used as the development direction of follow-up research.
目次 Table of Contents
目錄
論文審定書 i
誌謝 ii
摘要 iii
Abstract iv
第一章、緒論(Introduction) 1
第一節 研究背景(Research Background) 1
第二節 研究動機(Research Motivation) 2
第三節 研究目的(Research Purpose) 2
第四節 研究方法(Research Method) 3
第二章、文獻探討(Theoretical Background) 4
第一節 專案經理人能力(Project Manager’s Competences) 4
第二節 專案績效(Project Performance) 9
第三節 專案複雜度(Complexity of Information System Development Projects) 11
第三章 研究方法(Research Methodology) 12
第一節 研究模型(Research Model) 12
第二節 研究假說(Hypothesis) 12
第三節 操作型定義(Operational Definition) 14
第四節 研究採樣與資料收集(Sample and Data Collection) 17
第五節 研究構面與衡量因子(Construct and Measurements) 18
第四章 資料分析(Data Analysis) 21
第一節 問卷基本資料(Survey Basic Information) 21
第二節 問卷信效度分析(Reliability and Validity) 26
第三節 共同方法偏誤(Common Method Biases) 32
第四節 資料分析(Data Analysis) 34
第五節 討論(Discussion) 37
第五章 結論與建議(Conclusions and Suggestions) 40
第一節 結論(Conclusions) 40
第二節 學術與實務上的意涵(Academic and Practical Implications) 40
第三節 研究限制與未來研究建議(Limitations and Suggestions for Further Study) 41
參考文獻(References) 43
附錄一 調查問卷(Appendix) 45
附錄二 問卷題項刪減分析 (Appendix II) 51
參考文獻 References
林東清. (2018). 資訊管理 e化企業的核心競爭能力 (Vol. 第7版).
Arashpour, M., Abbasi, B., Arashpour, M., Hosseini, M.R., Yang, R., 2017.Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting. Int. J. Proj. Manag. 35 (4), 647–655.
Araújo, C. C. S. d., & Pedron, C. D. (2015). The IT project manager competencies that impact project success – A qualitative research. Organisational Project Management, 2(1). doi:10.5130/opm.v2i1.4142
Beck, R., Schott, K., 2012. The interplay of project control and interorganizational learning: mitigating effects on cultural differences in global, multisource ISD outsourcing projects. Bus. Inf. Syst. Eng. 4 (4), 183–192.
Blomquist, T., Farashah, A. D., & Thomas, J. (2016). Project management self-efficacy as a predictor of project performance: Constructing and validating a domain-specific scale. International Journal of Project Management, 34(8), 1417-1432. doi:10.1016/j.ijproman.2016.07.010
Cram, W.A., Brohman, M.K., Chan, Y.E., Gallupe, R.B., 2016a. Informationsystems control alignment: complementary and conflicting systems develop-ment controls. Inf. Manag. 53 (2), 183–196.
Demirkesen, S., & Ozorhon, B. (2017). Impact of integration management on construction project management performance. International Journal of ProjectManagement, 35(8), 1639-1654. doi:10.1016/j.ijproman.2017.09.008
Engelbrecht, J., Johnston, K. A., & Hooper, V. (2017). The influence of business managers' IT competence on IT project success. International Journal of Project Management, 35(6), 994-1005. doi:10.1016/j.ijproman.2017.04.016
Fornell, C., & Larcker, D. F. (1981), ‘Evaluating structural equation models withunobservable variables and measurement error’, Journal of marketing research,18(1), 39-50.
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011), ‘PLS-SEM: Indeed a silver bullet’,Journal of Marketing theory and Practice, 19(2), 139-152.
Kanwal, N., Zafar, M. S., & Bashir, S. (2017). The combined effects of managerial control,resource commitment, and top management support on the successful delivery ofinformation systems projects. International Journal of Project Management,35(8), 1459-1465. doi:10.1016/j.ijproman.2017.08.007
Lin, T.-C., Chen, C.-M., Hsu, J. S.-C., & Fu, T.-W. (2015). The impact of team knowledge on problem solving competence in information systems development team. International Journal of Project Management, 33(8), 1692-1703. doi:10.1016/j.ijproman.2015.07.007
Liu, L., Borman, M., Gao, J., 2014. Delivering complex engineering projects:reexamining organizational control theory. Int. J. Proj. Manag. 32 (5),791–802.
Müller, R., & Turner, J. R. (2007). Matching the project manager’s leadership style toproject type. International Journal of Project Management, 25(1), 21-32.doi:10.1016/j.ijproman.2006.04.003
Nunnally, J. (1978). Psychometric methods. 464–465.
PMI. Project Management Competence Development Framework 3rd .
Podsakoff, P. M., & Organ, D. W. (1986). Self-reports in organizational research:Problems and prospects. Journal of management, 12(4), 531-544.
Sanchez, O. P., Terlizzi, M. A., & de Moraes, H. R. d. O. C. (2017). Cost and time projectmanagement success factors for information systems development projects.International Journal of Project Management, 35(8), 1608-1626.doi:10.1016/j.ijproman.2017.09.007
Srivastava, S.C., Teo, T.S., 2012. Contract performance in offshore systems development: role of control mechanisms. J. Manag. Inf. Syst. 29 (1), 115–158.
Tiwana, A., 2010. Systems development ambidexterity: explaining the comple- mentary and substitutive roles of formal and informal controls. J. Manag. Inf. Syst. 27 (2), 87–126.
Wijayanto, B., & Nofrion, N. (2018). Learning Activities in Higher Order Thinking Skill (Hots) Oriented Learning Context. Geosfera Indonesia, 3(2). doi:10.19184/geosi.v3i2.8126
Xia, W., & Lee, G. (2014). Complexity of Information Systems Development Projects: Conceptualization and Measurement Development. Journal of Management Information Systems, 22(1), 45-83. doi:10.1080/07421222.2003.11045831
電子全文 Fulltext
本電子全文僅授權使用者為學術研究之目的,進行個人非營利性質之檢索、閱讀、列印。請遵守中華民國著作權法之相關規定,切勿任意重製、散佈、改作、轉貼、播送,以免觸法。
論文使用權限 Thesis access permission:校內校外完全公開 unrestricted
開放時間 Available:
校內 Campus: 已公開 available
校外 Off-campus: 已公開 available


紙本論文 Printed copies
紙本論文的公開資訊在102學年度以後相對較為完整。如果需要查詢101學年度以前的紙本論文公開資訊,請聯繫圖資處紙本論文服務櫃台。如有不便之處敬請見諒。
開放時間 available 已公開 available

QR Code